I made up a switch board with the two 40 Amp MPPT controllers, a pair of circuit breakers to bring the solar current to the controllers and a heavy duty battery switch to disconnect the controller output from the battery if required. I was able to pre wire the board, with only the feed from the solar panels (yet to be installed) to be wired in.